{"id":27414,"date":"2026-11-15T12:13:24","date_gmt":"2026-11-15T11:13:24","guid":{"rendered":"https:\/\/altax.al\/?post_type=product&#038;p=27414"},"modified":"2026-11-05T12:19:08","modified_gmt":"2026-11-05T11:19:08","slug":"albania-under-construction-edition-2","status":"publish","type":"product","link":"https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/","title":{"rendered":"Albania under construction, Edition 2"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221; css_params=&#8221;&#8221;]<\/p>\n<h1><span style=\"font-size: 15px;\">10 Findings on Albania\u2019s Construction and Housing Market<\/span><\/h1>\n<h2><span style=\"font-size: 15px;\">1. Legal intensity and effective intensity are two different quantities<\/span><\/h2>\n<p><span style=\"font-size: 15px;\">Legal intensity (I, m\u00b2 of floor area per m\u00b2 of plot) and the land-coverage ratio (KSHT, footprint to plot) are set zone by zone in the local plan and recorded in the development permit (Council of Ministers Decision no. 408\/2015, Articles 9 and 32). The effective intensity of the stock, meaning 1996\u20132024 residential permits against the 2023 Census stock, is about 31% nationally (range 27\u201336%). The two quantities cannot be compared with each other. Aggregate data do not prove that a norm has been exceeded: the only valid test is zonal compliance, which requires the plan map and building polygons. A permit issued against the plan is absolutely void (Law no. 107\/2014, Article 39, paragraph 4). Individual cases of excess have been documented by the State Audit and law-enforcement bodies (Section 4.7).<\/span><\/p>\n<h2><span style=\"font-size: 15px;\">2. Tirana carries the urban pressure<\/span><\/h2>\n<p><span style=\"font-size: 15px;\">Tirana accounts for about 81% of the residential floor area permitted in 2016\u20132024, with an effective intensity of 42\u201350% of the county stock against 31% nationally. The gross density of the county is 0.51 (0.44\u20130.59), a guiding indicator and not a legal intensity. The Urban Intensity Index (UII v1.0) is 70 out of 100 (range 51\u201374), with pressure from affordability, vacant stock and water. Tirana\u2019s share is 57% for 2005\u20132024, so concentration has grown over time and is not the same in every period.<\/span><\/p>\n<h2><span style=\"font-size: 15px;\">3. The legal infrastructure condition is the most exposed point<\/span><\/h2>\n<p><span style=\"font-size: 15px;\">Law no. 107\/2014 (Article 45, paragraph 1) and Council of Ministers Decision no. 408\/2015 (Article 14, paragraph 2) require main and secondary infrastructure to exist before a permit is granted. In Tirana water is supplied 17 hours a day and 90% of sewers are combined systems; nationally, non-revenue water is 61% and sewer coverage 57%. These facts indicate a risk that the condition is breached in saturated zones, but do not prove it without the zonal audit. The law already provides the instruments: conditional intensity (Article 30) and suspension of development (Article 33).<\/span><\/p>\n<h2><span style=\"font-size: 15px;\">4. The permit series has a break and a reporting gap<\/span><\/h2>\n<p><span style=\"font-size: 15px;\">From Q1 2025 INSTAT reports only municipal permits. Permits within the competence of the KKTU, including complex developments, objects in the coastal belt and buildings above 14 floors outside it (Decision no. 408\/2015, Article 19), remain outside the series, so about 30\u201370% of the floor area is missing. For 2025, 1,158 permits, 1.30 million m\u00b2 and about ALL 74 billion were recorded; the fall against 2024 (2.50 million m\u00b2) is not a real contraction. The law provides a National Electronic Register of Permits (Article 3, point 33\/1) and an annual AZHT report (Article 50), which make the gap correctable.<\/span><\/p>\n<h2><span style=\"font-size: 15px;\">5. Within the new series, activity is rising, but the cycle is concentrated in large projects<\/span><\/h2>\n<p><span style=\"font-size: 15px;\">In H1 2026, 782 permits were issued (+28.2%) covering 684 thousand m\u00b2 (+11.5%), while value fell to ALL 36.4 billion (\u22125.5%), so the declared value per m\u00b2 fell to ALL 38.4 thousand from 41.1 thousand. Two waves (2002\u20132011 and 2017\u20132024) produced 82% of the floor area permitted in 1996\u20132024, and the 2022\u20132024 average (2.427 million m\u00b2) exceeded the 2002\u20132011 boom. The annual number of permits fell 80% and the average area per permit rose 9 times, which raises the financial exposure of developers, banks and buyers.<\/span><\/p>\n<h2><span style=\"font-size: 15px;\">6. The fiscal signal exceeds the permit statistics<\/span><\/h2>\n<p><span style=\"font-size: 15px;\">Revenue from the infrastructure impact tax rose by about ALL 12.2 billion in H1 2026, which at the indicative rate of ALL 7,200\/m\u00b2 corresponds to about 1.7 million m\u00b2 (an indicative equivalent, against 0.68 million m\u00b2 in INSTAT). The Ministry of Finance explains it partly by pending permits that were approved, that is, by a timing effect. The tax is paid before the permit is delivered (Law no. 107\/2014, Article 46), so it is a verification signal and not proof of the real volume. Ring-fencing it for infrastructure is a priority measure.<\/span><\/p>\n<h2><span style=\"font-size: 15px;\">7. Prices remain high, while the housing problem is one of fit, not quantity<\/span><\/h2>\n<p><span style=\"font-size: 15px;\">The Fisher index rose 28% year on year in H2 2025 and 10% in H1 2026, unchanged against H2 2025; time to sell is 9.9 months. A 70 m\u00b2 dwelling in Tirana costs about 12 times the gross annual wage (indicative). The 2023 Census recorded 1,082,529 dwellings, 32.9% unoccupied; Tirana county has 85,457 empty dwellings and 60,596 households without a dwelling of their own. The residential stock is 103 million m\u00b2 GFA (89\u2013119), against 71 million m\u00b2 of living area. Law no. 22\/2018 on social housing (Article 19) offers an instrument to steer new developments toward affordable housing.<\/span><\/p>\n<h2><span style=\"font-size: 15px;\">8. Informality is the widest documented breach<\/span><\/h2>\n<p><span style=\"font-size: 15px;\">ASHK has processed 300 thousand objects since 2006 and 130 thousand declarations remain (June 2026), down from 237 thousand in 2024. The H1 2026 pace (34.8 thousand decisions a year) is 67% of the pace needed for 2028 (52 thousand). Building without a permit breaches Article 39 of Law no. 107\/2014 and is sanctioned by a fine (Article 52), confiscation or demolition (Article 40\/1) and, where the elements are met, by Article 199 of the Criminal Code; legalisation is governed by Law no. 20\/2020. The potential of uncollected taxes is ALL 85 billion (31\u2013173), an accumulated value and not an annual one.<\/span><\/p>\n<h2><span style=\"font-size: 15px;\">9. Coast and tourism: local pressure, not a shortage of rooms<\/span><\/h2>\n<p><span style=\"font-size: 15px;\">Annual net room occupancy is 32.8% and in August 2025 the average guests per night were 20.8 thousand, so capacity is not the national constraint. All works in the coastal belt (300 m) require a KKTU permit (Law no. 107\/2014, Articles 3, 28 and 41); the KKTU approved over 2.0 million m\u00b2 of coastal development in 2024, outside the INSTAT tables, so the statistical fall in Vlora is mostly missing coverage. Failure to declare works in the belt is fined at no less than ALL 35,000 per m\u00b2 (Article 52). The competence exists; the gap lies in the transparency and reporting of decisions.<\/span><\/p>\n<h2><span style=\"font-size: 15px;\">10. Environment and energy: the burden lies mostly in materials<\/span><\/h2>\n<p><span style=\"font-size: 15px;\">The electricity grid emits 25 gCO\u2082\/kWh (hydro 96%), so operational emissions are 0.09\u20131.5 tCO\u2082 per dwelling a year. The 2025 permits embed 0.46\u20130.85 MtCO\u2082e (350\u2013650 kgCO\u2082e\/m\u00b2), a lower bound. The health cost attributed to construction is EUR 30\u2013690 million a year (base 175). Regulation already exists: Law no. 116\/2016 and Article 27\/2 of Decision no. 408\/2015 require an energy performance certificate for the certificate of use; the new draft law aims to align with Directive (EU) 2024\/1275 and its adoption status must be verified.<\/span>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>This is the second edition of the study prepared by ALTAX Insight with the ALTAX Observatory. It updates the 1995\u20132024 permit series with 2025 and the first half of 2026 and organises the analysis by theme: urban intensity, the permit series and the cycle, stock and housing, informality, the impact tax, tourism and the coast, environment and energy, indices and policies. Intensity is treated as two different quantities, legal intensity (I and KSHT) and the effective intensity of the stock, which is 31% nationally (27\u201336%) and 42\u201350% in Tirana.<\/p>\n<p>Aggregate data do not prove that a zonal norm has been exceeded; compliance requires a GIS audit against the plan. Each observed case is linked to the specific legal norm and classified as a documented breach (unpermitted construction), a risk of breach (aggregate intensity and infrastructure in saturated zones) or a regulatory gap (reporting of KKTU permits, the impact tax, energy).<\/p>\n<p>Specific cases of intensity above the permit and of permits granted against urban conditions have been documented by the State Audit (Vlora, Fier) and by the police and prosecution (Tirana, 2026). From 2025 INSTAT reports only municipal permits, so the 2025 level (1.30 million m\u00b2) is not comparable with 2024 (2.50 million m\u00b2). Informality remains the widest breach: 130 thousand declarations pending, at 67% of the pace needed for 2028.<\/p>\n<p>Five priority measures are proposed at a cost of EUR 105\u2013185 million over 36 months, including unified reporting, a GIS density audit, enforcement of the infrastructure-capacity condition, ring-fencing of the impact tax and completion of legalisation. The comparison with Edition 1 and its corrections are given only in Annex C. The EUR 105\u2013185 million refers to the P1+P2 package of nine measures; the five measures summarised in Section 1 cover EUR 89.5\u2013149.3 million and the full reconciliation is given in Section 13.3.<\/p>\n<p>The 30\u201370% range of the area missing from KKTU permits is a range of methods and not a statistical interval (Annex A.10), while the evidence status of each headline result (measured, reported or modelled by ALTAX) is given in Annex A.9.<\/p>\n","protected":false},"featured_media":27415,"template":"","meta":{"inline_featured_image":false},"product_brand":[],"product_cat":[10379,10369,10800],"product_tag":[10299,20822,10445,21199,21197,11146,21200,21198],"class_list":["post-27414","product","type-product","status-publish","has-post-thumbnail","product_cat-altax-library-en","product_cat-altax-products-en","product_cat-publications","product_tag-albania-en","product_tag-building-permits","product_tag-construction-en","product_tag-embodied-carbon","product_tag-housing","product_tag-informality","product_tag-public-policy","product_tag-urban-density","first","instock","downloadable","virtual","purchasable","product-type-simple"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Albania under construction, Edition 2 - ALTAX<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Albania under construction, Edition 2 - ALTAX\" \/>\n<meta property=\"og:description\" content=\"This is the second edition of the study prepared by ALTAX Insight with the ALTAX Observatory. It updates the 1995\u20132024 permit series with 2025 and the first half of 2026 and organises the analysis by theme: urban intensity, the permit series and the cycle, stock and housing, informality, the impact tax, tourism and the coast, environment and energy, indices and policies. Intensity is treated as two different quantities, legal intensity (I and KSHT) and the effective intensity of the stock, which is 31% nationally (27\u201336%) and 42\u201350% in Tirana.  Aggregate data do not prove that a zonal norm has been exceeded; compliance requires a GIS audit against the plan. Each observed case is linked to the specific legal norm and classified as a documented breach (unpermitted construction), a risk of breach (aggregate intensity and infrastructure in saturated zones) or a regulatory gap (reporting of KKTU permits, the impact tax, energy).  Specific cases of intensity above the permit and of permits granted against urban conditions have been documented by the State Audit (Vlora, Fier) and by the police and prosecution (Tirana, 2026). From 2025 INSTAT reports only municipal permits, so the 2025 level (1.30 million m\u00b2) is not comparable with 2024 (2.50 million m\u00b2). Informality remains the widest breach: 130 thousand declarations pending, at 67% of the pace needed for 2028.  Five priority measures are proposed at a cost of EUR 105\u2013185 million over 36 months, including unified reporting, a GIS density audit, enforcement of the infrastructure-capacity condition, ring-fencing of the impact tax and completion of legalisation. The comparison with Edition 1 and its corrections are given only in Annex C. The EUR 105\u2013185 million refers to the P1+P2 package of nine measures; the five measures summarised in Section 1 cover EUR 89.5\u2013149.3 million and the full reconciliation is given in Section 13.3.  The 30\u201370% range of the area missing from KKTU permits is a range of methods and not a statistical interval (Annex A.10), while the evidence status of each headline result (measured, reported or modelled by ALTAX) is given in Annex A.9.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/\" \/>\n<meta property=\"og:site_name\" content=\"ALTAX\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Fiskalisti\/\" \/>\n<meta property=\"og:image\" content=\"https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"544\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/product\\\/albania-under-construction-edition-2\\\/\",\"url\":\"https:\\\/\\\/altax.al\\\/en\\\/product\\\/albania-under-construction-edition-2\\\/\",\"name\":\"Albania under construction, Edition 2 - ALTAX\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/altax.al\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/product\\\/albania-under-construction-edition-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/product\\\/albania-under-construction-edition-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/altax.al\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Alb-under-construction-Cover-1.jpg\",\"datePublished\":\"2026-11-15T11:13:24+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/product\\\/albania-under-construction-edition-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/altax.al\\\/en\\\/product\\\/albania-under-construction-edition-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/product\\\/albania-under-construction-edition-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/altax.al\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Alb-under-construction-Cover-1.jpg\",\"contentUrl\":\"https:\\\/\\\/altax.al\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Alb-under-construction-Cover-1.jpg\",\"width\":544,\"height\":768},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/product\\\/albania-under-construction-edition-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/altax.al\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Shop\",\"item\":\"https:\\\/\\\/altax.al\\\/en\\\/shop\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Albania under construction, Edition 2\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/altax.al\\\/#website\",\"url\":\"https:\\\/\\\/altax.al\\\/\",\"name\":\"ALTAX\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/altax.al\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/altax.al\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/altax.al\\\/#organization\",\"name\":\"ALTAX\",\"url\":\"https:\\\/\\\/altax.al\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/altax.al\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/altax.al\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/LOGO-ALTAX.svg\",\"contentUrl\":\"https:\\\/\\\/altax.al\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/LOGO-ALTAX.svg\",\"width\":\"1024\",\"height\":\"1024\",\"caption\":\"ALTAX\"},\"image\":{\"@id\":\"https:\\\/\\\/altax.al\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Fiskalisti\\\/\",\"https:\\\/\\\/www.instagram.com\\\/altaxstudio\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/altax\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Albania under construction, Edition 2 - ALTAX","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/","og_locale":"en_US","og_type":"article","og_title":"Albania under construction, Edition 2 - ALTAX","og_description":"This is the second edition of the study prepared by ALTAX Insight with the ALTAX Observatory. It updates the 1995\u20132024 permit series with 2025 and the first half of 2026 and organises the analysis by theme: urban intensity, the permit series and the cycle, stock and housing, informality, the impact tax, tourism and the coast, environment and energy, indices and policies. Intensity is treated as two different quantities, legal intensity (I and KSHT) and the effective intensity of the stock, which is 31% nationally (27\u201336%) and 42\u201350% in Tirana.  Aggregate data do not prove that a zonal norm has been exceeded; compliance requires a GIS audit against the plan. Each observed case is linked to the specific legal norm and classified as a documented breach (unpermitted construction), a risk of breach (aggregate intensity and infrastructure in saturated zones) or a regulatory gap (reporting of KKTU permits, the impact tax, energy).  Specific cases of intensity above the permit and of permits granted against urban conditions have been documented by the State Audit (Vlora, Fier) and by the police and prosecution (Tirana, 2026). From 2025 INSTAT reports only municipal permits, so the 2025 level (1.30 million m\u00b2) is not comparable with 2024 (2.50 million m\u00b2). Informality remains the widest breach: 130 thousand declarations pending, at 67% of the pace needed for 2028.  Five priority measures are proposed at a cost of EUR 105\u2013185 million over 36 months, including unified reporting, a GIS density audit, enforcement of the infrastructure-capacity condition, ring-fencing of the impact tax and completion of legalisation. The comparison with Edition 1 and its corrections are given only in Annex C. The EUR 105\u2013185 million refers to the P1+P2 package of nine measures; the five measures summarised in Section 1 cover EUR 89.5\u2013149.3 million and the full reconciliation is given in Section 13.3.  The 30\u201370% range of the area missing from KKTU permits is a range of methods and not a statistical interval (Annex A.10), while the evidence status of each headline result (measured, reported or modelled by ALTAX) is given in Annex A.9.","og_url":"https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/","og_site_name":"ALTAX","article_publisher":"https:\/\/www.facebook.com\/Fiskalisti\/","og_image":[{"width":544,"height":768,"url":"https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/","url":"https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/","name":"Albania under construction, Edition 2 - ALTAX","isPartOf":{"@id":"https:\/\/altax.al\/#website"},"primaryImageOfPage":{"@id":"https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/#primaryimage"},"image":{"@id":"https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/#primaryimage"},"thumbnailUrl":"https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1.jpg","datePublished":"2026-11-15T11:13:24+00:00","breadcrumb":{"@id":"https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/#primaryimage","url":"https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1.jpg","contentUrl":"https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1.jpg","width":544,"height":768},{"@type":"BreadcrumbList","@id":"https:\/\/altax.al\/en\/product\/albania-under-construction-edition-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/altax.al\/en\/"},{"@type":"ListItem","position":2,"name":"Shop","item":"https:\/\/altax.al\/en\/shop\/"},{"@type":"ListItem","position":3,"name":"Albania under construction, Edition 2"}]},{"@type":"WebSite","@id":"https:\/\/altax.al\/#website","url":"https:\/\/altax.al\/","name":"ALTAX","description":"","publisher":{"@id":"https:\/\/altax.al\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/altax.al\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/altax.al\/#organization","name":"ALTAX","url":"https:\/\/altax.al\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/altax.al\/#\/schema\/logo\/image\/","url":"https:\/\/altax.al\/wp-content\/uploads\/2021\/11\/LOGO-ALTAX.svg","contentUrl":"https:\/\/altax.al\/wp-content\/uploads\/2021\/11\/LOGO-ALTAX.svg","width":"1024","height":"1024","caption":"ALTAX"},"image":{"@id":"https:\/\/altax.al\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Fiskalisti\/","https:\/\/www.instagram.com\/altaxstudio\/","https:\/\/www.linkedin.com\/in\/altax\/"]}]}},"_links":{"self":[{"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/product\/27414","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/media\/27415"}],"wp:attachment":[{"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/media?parent=27414"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/product_brand?post=27414"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/product_cat?post=27414"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/product_tag?post=27414"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}