{"id":27420,"date":"2026-11-16T12:47:21","date_gmt":"2026-11-16T11:47:21","guid":{"rendered":"https:\/\/altax.al\/?p=27420"},"modified":"2026-11-05T12:48:32","modified_gmt":"2026-11-05T11:48:32","slug":"albania-under-construction-edition-2","status":"publish","type":"post","link":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/","title":{"rendered":"ALBANIA UNDER CONSTRUCTION \u2013 EDITION 2"},"content":{"rendered":"\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>Analysis of the Construction and Housing Market | ALTAX Insight &amp; ALTAX Observatory<\/strong><\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">ALTAX Insight, in collaboration with ALTAX Observatory, presents the second edition of <strong>\u201cAlbania Under Construction\u201d<\/strong>, an updated study of developments in Albania\u2019s construction and housing market. This edition extends the historical construction-permit series for 1995\u20132024 by incorporating data for 2025 and the first half of 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The study goes beyond measuring construction activity. It examines the relationship between urban development, law enforcement, infrastructure capacity, housing affordability, informality, public revenues and environmental sustainability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Its central finding is that Albania\u2019s construction challenge is not simply how much is being built, but where, under what conditions, for whom, and at what public and long-term cost.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The analysis identifies ten key findings:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Urban development intensity:<\/strong> Legally permitted development intensity and the effective intensity of the existing housing stock are two distinct measures. The latter is estimated at approximately 31% nationally and 42\u201350% in Tirana County. Aggregate data do not establish violations of legally permitted zoning limits; assessing compliance requires a GIS-based audit of local plans and building footprints.<\/li>\n\n\n\n<li><strong>Concentration in Tirana:<\/strong> Approximately 81% of the residential floor area permitted during 2016\u20132024 was concentrated in Tirana, increasing pressure on infrastructure, housing and public services.<\/li>\n\n\n\n<li><strong>Infrastructure capacity:<\/strong> Water supply, sewerage and supporting infrastructure represent one of the most exposed areas in terms of compliance with the legal requirements for new development.<\/li>\n\n\n\n<li><strong>Construction-permit transparency:<\/strong> Since 2025, INSTAT has reported only municipal permits, excluding a significant share of permits issued by the National Territorial Development Council (KKTU). Consequently, the decline in reported floor area from 2.50 million m\u00b2 in 2024 to 1.30 million m\u00b2 in 2025 cannot be interpreted as an actual contraction of the market.<\/li>\n\n\n\n<li><strong>The construction cycle:<\/strong> The two major development waves, 2002\u20132011 and 2017\u20132024, account for approximately 82% of permitted floor area during 1996\u20132024. The increase in average project size raises the financial exposure of developers, banks and property buyers.<\/li>\n\n\n\n<li><strong>Fiscal signals:<\/strong> Revenue from the infrastructure impact tax provides a signal that requires reconciliation with construction-permit statistics and greater transparency regarding the use of these revenues.<\/li>\n\n\n\n<li><strong>Housing affordability:<\/strong> Prices remain high, while the housing challenge increasingly concerns the mismatch between the existing housing stock, location, demand and households\u2019 purchasing power. Approximately 32.9% of dwellings recorded in the 2023 Census were unoccupied.<\/li>\n\n\n\n<li><strong>Informality:<\/strong> Informal construction remains the most extensive documented violation. As of June 2026, approximately 130,000 declarations were still awaiting processing, while the current legalization rate represents only 67% of the pace required to complete the process by 2028.<\/li>\n\n\n\n<li><strong>Coastal development and tourism:<\/strong> Pressure is primarily local and relates to the concentration of development and the transparency of decision-making, rather than a nationwide shortage of accommodation capacity.<\/li>\n\n\n\n<li><strong>Environment and energy:<\/strong> Most of construction\u2019s environmental burden is associated with building materials and the construction phase, making life-cycle assessment essential.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>From findings to public action<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An important contribution of this edition is its clear distinction between documented violations, risks of potential non-compliance, and gaps in reporting or institutional implementation. This approach avoids generalizations and links each identified problem to its legal basis, evidence status and relevant policy instrument.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The study proposes a priority action package for a 36-month period, with an estimated cost of EUR 105\u2013185 million for the full P1+P2 package, comprising nine measures. Five of the main measures highlighted in the report are:<\/p>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li>Standardizing and publishing a unified national construction-permit reporting system.<\/li>\n\n\n\n<li>Conducting GIS-based audits of development intensity and compliance with local urban plans.<\/li>\n\n\n\n<li>Enforcing infrastructure-capacity requirements before construction permits are approved.<\/li>\n\n\n\n<li>Ring-fencing infrastructure impact tax revenues and directing them towards relevant infrastructure investments.<\/li>\n\n\n\n<li>Accelerating and completing the processing of informal construction and legalization cases.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">The five measures summarized in Section 1 have an estimated cost of EUR 89.5\u2013149.3 million, while the reconciliation with the full package is provided in Section 13.3.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>\u201cAlbania Under Construction \u2013 Edition 2\u201d<\/strong> aims to contribute to a better-informed public debate, in which construction is assessed not only as a source of investment and economic growth, but also in terms of urban development quality, housing affordability, compliance with the law, infrastructure capacity and the costs it imposes on the economy and society.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The study forms part of ALTAX\u2019s integrated approach: <strong>research, evidence, monitoring and interpretation<\/strong>, with the objective of translating economic and institutional information into public understanding and concrete policy alternatives.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Analysis of the Construction and Housing Market | ALTAX Insight &amp; ALTAX Observatory ALTAX Insight, in collaboration with ALTAX Observatory, presents the second edition of \u201cAlbania Under Construction\u201d, an updated [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":27415,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[10475],"tags":[9763,16271,8400,21203,10796,9827,16507,21204],"class_list":["post-27420","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en","tag-albania-en-2","tag-building-permits","tag-construction","tag-embodied-carbon","tag-housing","tag-informality-en-2","tag-public-policy","tag-urban-density"],"featured_image_src":{"landsacpe":["https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1-544x445.jpg",544,445,true],"list":["https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1-463x348.jpg",463,348,true],"medium":["https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1-213x300.jpg",213,300,true],"full":["https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1.jpg",544,768,false]},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ALBANIA UNDER CONSTRUCTION \u2013 EDITION 2 - ALTAX<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ALBANIA UNDER CONSTRUCTION \u2013 EDITION 2 - ALTAX\" \/>\n<meta property=\"og:description\" content=\"Analysis of the Construction and Housing Market | ALTAX Insight &amp; ALTAX Observatory ALTAX Insight, in collaboration with ALTAX Observatory, presents the second edition of \u201cAlbania Under Construction\u201d, an updated [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/\" \/>\n<meta property=\"og:site_name\" content=\"ALTAX\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Fiskalisti\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-16T11:47:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"544\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"ALTax\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ALTax\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/\"},\"author\":{\"name\":\"ALTax\",\"@id\":\"https:\\\/\\\/altax.al\\\/#\\\/schema\\\/person\\\/1d3de87f09d64bc62d8810cf6909936a\"},\"headline\":\"ALBANIA UNDER CONSTRUCTION \u2013 EDITION 2\",\"datePublished\":\"2026-11-16T11:47:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/\"},\"wordCount\":694,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/altax.al\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/altax.al\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Alb-under-construction-Cover-1.jpg\",\"keywords\":[\"albania\",\"building permits\",\"construction\",\"embodied carbon\",\"housing\",\"informality\",\"public policy\",\"urban density\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/\",\"url\":\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/\",\"name\":\"ALBANIA UNDER CONSTRUCTION \u2013 EDITION 2 - ALTAX\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/altax.al\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/altax.al\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Alb-under-construction-Cover-1.jpg\",\"datePublished\":\"2026-11-16T11:47:21+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/altax.al\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Alb-under-construction-Cover-1.jpg\",\"contentUrl\":\"https:\\\/\\\/altax.al\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Alb-under-construction-Cover-1.jpg\",\"width\":544,\"height\":768},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/altax.al\\\/en\\\/albania-under-construction-edition-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/altax.al\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ALBANIA UNDER CONSTRUCTION \u2013 EDITION 2\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/altax.al\\\/#website\",\"url\":\"https:\\\/\\\/altax.al\\\/\",\"name\":\"ALTAX\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/altax.al\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/altax.al\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/altax.al\\\/#organization\",\"name\":\"ALTAX\",\"url\":\"https:\\\/\\\/altax.al\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/altax.al\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/altax.al\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/LOGO-ALTAX.svg\",\"contentUrl\":\"https:\\\/\\\/altax.al\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/LOGO-ALTAX.svg\",\"width\":\"1024\",\"height\":\"1024\",\"caption\":\"ALTAX\"},\"image\":{\"@id\":\"https:\\\/\\\/altax.al\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Fiskalisti\\\/\",\"https:\\\/\\\/www.instagram.com\\\/altaxstudio\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/altax\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/altax.al\\\/#\\\/schema\\\/person\\\/1d3de87f09d64bc62d8810cf6909936a\",\"name\":\"ALTax\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7120db1f6e95ed798e760d7a2c8dfa62ae8ae45544693449ddc879a77dd23c47?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7120db1f6e95ed798e760d7a2c8dfa62ae8ae45544693449ddc879a77dd23c47?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7120db1f6e95ed798e760d7a2c8dfa62ae8ae45544693449ddc879a77dd23c47?s=96&d=mm&r=g\",\"caption\":\"ALTax\"},\"sameAs\":[\"https:\\\/\\\/www.altax.al\"],\"url\":\"https:\\\/\\\/altax.al\\\/en\\\/author\\\/altax\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ALBANIA UNDER CONSTRUCTION \u2013 EDITION 2 - ALTAX","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/","og_locale":"en_US","og_type":"article","og_title":"ALBANIA UNDER CONSTRUCTION \u2013 EDITION 2 - ALTAX","og_description":"Analysis of the Construction and Housing Market | ALTAX Insight &amp; ALTAX Observatory ALTAX Insight, in collaboration with ALTAX Observatory, presents the second edition of \u201cAlbania Under Construction\u201d, an updated [&hellip;]","og_url":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/","og_site_name":"ALTAX","article_publisher":"https:\/\/www.facebook.com\/Fiskalisti\/","article_published_time":"2026-11-16T11:47:21+00:00","og_image":[{"width":544,"height":768,"url":"https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1.jpg","type":"image\/jpeg"}],"author":"ALTax","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ALTax","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/#article","isPartOf":{"@id":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/"},"author":{"name":"ALTax","@id":"https:\/\/altax.al\/#\/schema\/person\/1d3de87f09d64bc62d8810cf6909936a"},"headline":"ALBANIA UNDER CONSTRUCTION \u2013 EDITION 2","datePublished":"2026-11-16T11:47:21+00:00","mainEntityOfPage":{"@id":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/"},"wordCount":694,"commentCount":0,"publisher":{"@id":"https:\/\/altax.al\/#organization"},"image":{"@id":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/#primaryimage"},"thumbnailUrl":"https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1.jpg","keywords":["albania","building permits","construction","embodied carbon","housing","informality","public policy","urban density"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/altax.al\/en\/albania-under-construction-edition-2\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/","url":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/","name":"ALBANIA UNDER CONSTRUCTION \u2013 EDITION 2 - ALTAX","isPartOf":{"@id":"https:\/\/altax.al\/#website"},"primaryImageOfPage":{"@id":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/#primaryimage"},"image":{"@id":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/#primaryimage"},"thumbnailUrl":"https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1.jpg","datePublished":"2026-11-16T11:47:21+00:00","breadcrumb":{"@id":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/altax.al\/en\/albania-under-construction-edition-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/#primaryimage","url":"https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1.jpg","contentUrl":"https:\/\/altax.al\/wp-content\/uploads\/2026\/11\/Alb-under-construction-Cover-1.jpg","width":544,"height":768},{"@type":"BreadcrumbList","@id":"https:\/\/altax.al\/en\/albania-under-construction-edition-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/altax.al\/en\/"},{"@type":"ListItem","position":2,"name":"ALBANIA UNDER CONSTRUCTION \u2013 EDITION 2"}]},{"@type":"WebSite","@id":"https:\/\/altax.al\/#website","url":"https:\/\/altax.al\/","name":"ALTAX","description":"","publisher":{"@id":"https:\/\/altax.al\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/altax.al\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/altax.al\/#organization","name":"ALTAX","url":"https:\/\/altax.al\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/altax.al\/#\/schema\/logo\/image\/","url":"https:\/\/altax.al\/wp-content\/uploads\/2021\/11\/LOGO-ALTAX.svg","contentUrl":"https:\/\/altax.al\/wp-content\/uploads\/2021\/11\/LOGO-ALTAX.svg","width":"1024","height":"1024","caption":"ALTAX"},"image":{"@id":"https:\/\/altax.al\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Fiskalisti\/","https:\/\/www.instagram.com\/altaxstudio\/","https:\/\/www.linkedin.com\/in\/altax\/"]},{"@type":"Person","@id":"https:\/\/altax.al\/#\/schema\/person\/1d3de87f09d64bc62d8810cf6909936a","name":"ALTax","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7120db1f6e95ed798e760d7a2c8dfa62ae8ae45544693449ddc879a77dd23c47?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7120db1f6e95ed798e760d7a2c8dfa62ae8ae45544693449ddc879a77dd23c47?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7120db1f6e95ed798e760d7a2c8dfa62ae8ae45544693449ddc879a77dd23c47?s=96&d=mm&r=g","caption":"ALTax"},"sameAs":["https:\/\/www.altax.al"],"url":"https:\/\/altax.al\/en\/author\/altax\/"}]}},"_links":{"self":[{"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/posts\/27420","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/comments?post=27420"}],"version-history":[{"count":1,"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/posts\/27420\/revisions"}],"predecessor-version":[{"id":27520,"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/posts\/27420\/revisions\/27520"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/media\/27415"}],"wp:attachment":[{"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/media?parent=27420"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/categories?post=27420"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/altax.al\/en\/wp-json\/wp\/v2\/tags?post=27420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}